Parrain-linux

  • Status Attribué
  • Percent Complete
    70%
  • Task Type dev
  • Category Dev
  • Assigned To
    Balam
  • Operating System All
  • Severity Low
  • Priority Medium
  • Reported Version 4.0
  • Due in Version 5.0.a2
  • Due Date Undecided
  • Votes
  • Private
Attached to Project: Parrain-linux
Opened by Balam - 01.11.2018
Last edited by Balam - 21.06.2019

FS#6 - forum

mise en place d’un forum

This task is a sub task of FS#7 - Laravel
This task has the following sub-tasks
ID Project Summary Priority Severity Assigned To Progress
10 Parrain-linux FS#10 - threads Medium Low Balam
90%
11 Parrain-linux FS#11 - Reply Medium Low Balam
90%
12 Parrain-linux FS#12 - user Medium Low Balam
20%
13 Parrain-linux FS#13 - role Medium Low Balam
0%
14 Parrain-linux FS#14 - Acces mp Medium Low Balam
0%
16 Parrain-linux FS#16 - Catégories Medium Low Balam
90%

Loading...

Available keyboard shortcuts

Tasklist

Task Details

Task Editing